WWTP Optimization – Asphalt Refinery - New Jersey | Estimated TIC: $9 MM

Writer's picture: Kyle MillerKyle Miller

Updated: 6 days ago

Description

• Upgrade existing wastewater treatment plant to treat increased levels of organics and ammonia in wastewater from a change in crude material processed in the facility



Scope of Work

• Place existing oil water separator in service

• Install new dissolved air flotation unit

• Install new moving bed biological reaction system with spill containment

• Upgrade controls and move to DCS control of process


Challenges

• Determining status of existing design as On-Board assumed project control from other engineering firm during design

• Completing all design areas and procurement

• Schedule


Keys to Success

• Knowledge of site-based process and project engineers

• Leveraged services from home offices optimizing design