Scrubber BOP Piping Project – Electric Utility Company - North Dakota | Estimated TIC: $50 MM
- Kyle Miller
- Feb 6
- 1 min read
Updated: Apr 4
Description
• Flue gas desulfurization system at the Minnkota Power Cooperative.

Scope of Work
• BOP for a flue gas desulfurization system
including the scrubber and lime preparation
areas.
• Pipe layout, routing, tie-ins, stress
analysis and supports.
• Over 80 lines.
• 1-1/2” – 30” FRP and SS piping.
• Structural supports and platforms.
Challenges
• Compressed schedule
• Coordination between client, vendors and
plant.
Keys to Success
• Integrated project team
• FTP file transfer system