Description

• Flue gas desulfurization system at the Minnkota Power Cooperative.



Scope of Work

• BOP for a flue gas desulfurization system

including the scrubber and lime preparation

areas.

• Pipe layout, routing, tie-ins, stress

analysis and supports.

• Over 80 lines.

• 1-1/2” – 30” FRP and SS piping.

• Structural supports and platforms.


Challenges

• Compressed schedule

• Coordination between client, vendors and

plant.


Keys to Success

• Integrated project team

• FTP file transfer system