Description
• Developed the Front-End Loading (conceptual design) and the process basis of design (BOD) for the construction of a new Polymer Modified Asphalt System at an existing asphalt plant.

Scope of Work
• D&R plan for existing equipment & foundations. Design of new PMA mixing operations, including:
• Raw Material & Auxiliary Chemical Transfer
• Ingredient Metering System
• Mixing Reactor
• Finished Product Transfer, Storage and Loading
Challenges
• Confines of Existing Facility & Operations
Keys to Success
• Integrated Project Team
• On-Board Polymer Experience