top of page

Chemical Processing Company Program Management Multiple Locations | Estimated TIC: $1,000MM (+)

Writer's picture: Kyle MillerKyle Miller

Updated: 6 days ago

Description

• Engineering and design services for small to large Capital and Maintenance



Projects

• Thousands of projects over a 40 (+) year span with fees ranging from $1K to over $10MM.


Scope of Work

• Provide process, piping, mechanical, electrical, instrumentation and control systems, civil, structural, architectural design and construction management.


Challenges

• Learning local plant business cultures.

• Various degrees of existing documentation.


Keys to Success

• Balance site vs. corporate priorities.

• Open communication.

OBE - Revised Badge_4x.png

609-945-8000

50 Millstone Rd.
Bldg. 300 Suite 110
East Windsor, NJ 08520

2 Penn's Way - Suite 400,

New Castle, DE 19720

bottom of page