Arsine Production Facility – Electronics Company Pennsylvania | Estimated TIC: $42 MM

Writer's picture: Kyle MillerKyle Miller

Updated: 6 days ago

Description

• Greenfield Arsine Production facility adjacent to existing operating plant; still in construction with target startup in May



Scope of Work

• Front-End Engineering and Detailed Design (FEED) based on similar process at Catoosa, Oklahoma

• Design and specify over 250 pieces of equipment and 1,400 instrument devices

• 3D model with over 600 lines (pipe and tubing)

• Approximately 200 tons of steel and 1,000 cubic yards of concrete

• Basic Process Control System (BPCS) PLC + Life Safety (SIS) PLC

• Custom ventilated enclosures for Arsine manufacture

• Interface with regulatory agencies during permitting process

• T&M Not to Exceed for FEED including detailed design


Challenges

• New client with limited experience working with Design/ Engineering firms

• Ever changing design requirements during FEED stages

• Large vendor packages incorporated into the general arrangement and layout

• Hazardous nature of product required specialty and complex equipment design

• Owner controlled interfaces; coordination critical


Keys to Success

• Strong team ORG Chart

• Weekly RAIL (Running Action Item List) meetings

• Lines of communication

• Establish trust and an effective working relationship