Description

• 29-H-8 horizontal cabin style re-boiler furnace was

damaged due to fire in 1980’s. The furnace was

installed in 1956 as part of the original refinery

equipment.

• Heater remained in service until 2010 when refinery

leadership decided to look at replacing.



Scope of Work

• Structural evaluation of fire damaged 29-H-8 Heater.

• Determine if Heater requires replacement.

• Design of structural reinforcing to upgrade structural

frame.


Challenges

• Determining residual stresses due to fire damage.

• Convincing client replacement was not required.


Keys to Success

• Detailed analysis with Engineering Judgment.

• Reinforcing vs. replacement cost savings of $10MM

(+/-).

0 views0 comments

コメント


コメント機能がオフになっています。
OBE - Revised Badge_4x.png

609-945-8000

50 Millstone Rd.
Bldg. 300 Suite 110
East Windsor, NJ 08520

2 Penn's Way - Suite 400,

New Castle, DE 19720

bottom of page